
Responding to the necessity to provide 10 kV electricity to wastewater station with capacity of 600.000 cub. m/day (as projected). The requirement is to design and construct a transforming substation with the equal capacity. In the design and construction of transforming substation 110/10 kV, 16 MVA the newest innovative electro-supply technologies will be used.
|