Regulating cross-regulating structure at km 793of the Karakum Canal
-
Hydraulic engineering projects
-
Production
-
Design
Project Status:
2026About the project
The project is intended to ensure a guaranteed municipal and drinking water supply for the city of Ashgabat.
Scope of works
- Client: Government of Turkmenistan
- Discharge: 181 m³/s
- Manufacture and installation of GK-85 gates: 12 units
- Commissioning works