Regulating control structure at the 793rd km of the Karakum River
-
Hydraulic engineering projects
-
Production
-
Design
Project Status:
Completed in 2026About the project
The project is designed to provide a guaranteed domestic and drinking water intake for the city of Ashgabat.
Scope of works
- Client: Government of Turkmenistan
- Discharge: 181 m3/second
- Manufacture and installation of GK-85 gates: 12 units
- Earthworks: 660 000 m3
- Concrete works: 7 148 m3
- Construction of the diversion canal: 979.1 linear meters
- Bed protection of the Karakum River: 420 linear meters
- Dispatch control point: 1